4 Product Long Draw System Starter Kit

$884.97
In Stock | Rapid Ship
SKU
LDK4LN
4 Product Long Draw System Starter Kit

4 Product Long Draw System Starter Kit

If you are in the process of building a beer dispensing system, look no further than this long draw system starter kit. This kit contains panel mounted regulators, couplers, gas distributors, glycol & CO2 kits, hoses, and clamps. We've specially designed this kit to include everything you need for your system outside of the chiller, trunk line, gas blender, FOB, and tower, which tend to be more customized to your setup. See our other beer system offerings to complete your custom long draw system.

Included in the starter kit:

  • 1x CO2 Regulator, 4 Product, Panel Mounted
  • 4x Worm Drive Hose Clamp, 1/4-5/8"
  • 4x Worm Drive Hose Clamp, 1/4-7/8"
  • 4x Single Valve Coupler, Short Handle
  • PP337: 1x Glycol Installation Set, includes:
    • 25ft of Braided Vinyl Tubing
    • 8x Worm Drive Hose Clamp, 1/4-5/8"
    • 1x Faucet Wrench
    • 2x Hose Union SS 3/8" x 3/8"
    • Foam Insulation Tape
    • Sponge Insulation 7/8" ID, 6ft length, 1/2" thickness
    • Black Duct Tape
  • PP324: 1x CO2 Installation Set, includes:
    • 25ft of Braided Vinyl Tubing 5/16x 9/16"
    • 4x Worm Drive Hose Clamp, 1/4-7/8"
    • 1x Double Gauge Regulator
    • Teflon Tape
More Information
Manufacturer Rapids
MPN LDK4LN
SKU LDK4LN
Write Your Own Review
You're reviewing:4 Product Long Draw System Starter Kit
Your Rating

You may also be interested in...